Previous Work 

This page showcases some of our previous work and abilities. All our work is done neat, clean, plumb, level, square, to code and by the books.

1088 Cast Iron Boiler Installation

IMG_0391.JPG
IMG_0396.JPG

1088 Cast Iron Boiler installation. Demoed old boiler and set new one. Piped up according to manual with Hartford loop. Engineered and ran header, Hartford loop, drain line, feed line and burner lines. Hydro tested. Also installed insulated jacket.

IMG_0394.JPG
IMG_0399.JPG
IMG_0400.JPG
20201014_132335.jpg

3 Soft Water Tanks Installation

20210120_120302.jpg
20210125_142846.jpg

Set and filled all 3 tanks. Tied into existing feed water line and outgoing line. Tied into tanks in the order 1, 2, 3 and out of the returns 3, 2, 1 to equalize the usage of each tank. Also ran overflow drain lines.

Built Hand Sanitizer Stands

20200628_113803.jpg
20200513_150538 (1).jpg
Dad Welding.jpg

Designed, built, and painted over 100 stands designed to hold self dispensing hand sanitizer units. We can still make and deliver these stands today for any company.

Installed Recirculating Loops

20201015_140225.jpg
20201016_135648.jpg
20201015_140256.jpg

Installed two 6" recirculating loops (Black pipe) on two boilers in a hospital basement. Included spools so they could be moved and make room to open the boiler.

Section and Header Change

Disassembled boiler in house basement to analyze leak. Changed two sections and re-ran the header and tie ins to make a more efficient system and a correct Hartford Loop.

IMG_0416.JPG
20201019_120321.jpg
20201019_141841.jpg
20201021_110212.jpg
20201021_110211.jpg

Pumps Installated and System Piped

IMG_0652.JPG
IMG_0653.JPG
IMG_0654.JPG

New building. Poured concrete pad and set two pumps. Engineered and ran all piping seen in the pictures - valves, welded lines, threaded lines complete with hangers and Unistrut supports.

IMG_0654.JPG

Heat Exchanger and Trap Piping

IMG_0648.JPG
IMG_0650.JPG
IMG_0651.JPG

Set heat exchanger and piped it into system. Work includes a large amount of measuring, leveling and building on tri-pods (pre-fab) before take it up on ladders and tying the piping into the system (right two pictures). Pipe is all supported with hangers, Unistrut and anchors.

Boiler and Tank Installation (3 Parts)

Demolition

Torched out pipe, hauled off old sections, broke up and hauled off old concrete pad.

20201029_161414.jpg
20201102_103635.jpg
20201103_124633.jpg
Building

Poured new concrete pad, assembled burner, pulled together sections, assembled casing, engineered and piped the header, water feed line, Hartford loop and McDonnell Miller piping. Also Installed new tank, piped it up and tied it into the boiler.

20201103_112939.jpg
20201105_121255.jpg
20201105_121255.jpg
20201106_130929.jpg
20201113_084347.jpg
Finished

Finished Boiler. Tied into system, tied breaching in, ran old gas line into burner and finished the casing.

20201113_084320.jpg
20201111_112842.jpg
Screenshot_20201113-203524_Photos.jpg

Burner Ring Remodel and Recirculating Loop Installed

Modified and built a nearly 4' wide burner ring to be installed with the burner onto the boiler (we only made the ring, did not install), and routed and installed a new recirculation loop on the boiler completed with 3 supports.

BEF8BBD2-F78C-4ABA-9E46-9EA1332D77CF.jpe
92AA11F0-35BE-40D0-9B4C-F3B0C2305E48.jpe
20210323_095648.jpg
F1107FD4-CAF2-4DE9-9B2B-E7285A26CAFE.jpe
20AB10D8-13C9-4719-A5A9-DDCD4BE98C37.jpe
05EFC1CC-A517-43CD-9E1F-5147653F995E.jpe
20210323_095648.jpg

Note that a significant amount of our work is done at plants and facilities that do not allow pictures to be taken. The works shown above do not represent all or even half of the work we have done nor do they represent all of the things we are capable of doing.